Project Details
CLIENT: PELICAN L23 OCEANSIDE, LLC
ARCHITECT: KTGY GROUP, INC.
ARCHITECT: BGB DESIGN GROUP
INTERIOR DESIGNER: AMBROSIA INTERIOR DESIGN
LOCATION: OCEANSIDE, CALIFORNIA
SQUARE FOOTAGE: 95,711
NUMBER OF UNITS: 52 UNITS
This 52 unit ground-up project kicked off Level 3 Construction’s New Year with a groundbreaking ceremony in January 2018. The 52-unit project, Salt, has a projected end date of May 2019. Level 3 Construction willingly decided to take on this lengthy project to display its versatility and ability to take on a wide scale of projects. The property currently provides a public and private parking structure, and the finished building is to include roof top decks that overlook the pier that stands in Oceanside, California. The final product additionally will include the nautilus shell terrazzo entry, exemplifying the beachy environment and lifestyle of the Oceanside area. Level 3 Construction is excited to take on this project, and with the use of local established relationships, Level 3 is committed and certain that they will complete this project efficiently.